Real-world Results Across Mission-Critical Estates

Explore how EMC delivers measurable resilience, capacity and energy reduction across complex infrastructure.

Global Technology Client (UK)

Sector: Advanced Manufacturing / Data Infrastructure
Location: Southampton
Focus: Capacity expansion, power resilience, energy reduction

The Challenge

This global technology organisation is a next-generation hollow-core fibre manufacturer supporting ultra-low latency, high-security digital infrastructure. Rapid expansion plans required:

  • Increased electrical capacity

  • Improved power quality

  • Reduced energy demand

  • Protection of critical cooling systems

  • Expansion readiness through 2027+

The existing electrical infrastructure was forecast to exceed capacity by mid-2025 without strategic intervention.

Measured Results (Jan–Jun 2025)

Verified performance improvements delivered through EMC’s engineered solution framework.

0
%
Total Site Demand Reduction
0
%
Daily Chiller Energy Reduction
0
kWh
Voltage Optimisation Savings
0
%
kVA Reduction (PFC + Harmonics)

The EMC Solution

Technology Purpose
Voltage Optimisation Reduced over-voltage losses and unnecessary electrical consumption
Power Factor Correction Released hidden electrical capacity and reduced kVA demand
Harmonics Filtering Improved power quality, reduced equipment stress and improved system efficiency
Maxwell® Cooling Optimisation Reduced chiller energy consumption and improved cooling system efficiency
Measure Result Impact
Voltage Optimisation 86,861 kWh saved 6.3% reduction in electrical consumption
Power Factor Correction 4–5% kVA reduction Released hidden electrical capacity
Harmonics Filtering Improved power quality Reduced electrical stress and losses
Maxwell® Cooling Optimisation 19% daily energy reduction Lower chiller energy demand
Total Site Impact ~10% total demand reduction Enabled capacity for future expansion

This enabled the client to continue expansion without immediate grid upgrades.

Outcome:

  • Released electrical capacity for future expansion

  • Reduced operating costs and carbon footprint

  • Improved EPC and compliance positioning

  • Futureproofed critical infrastructure

Data Centre Installation – Fibre Telecoms Facility

Power and cooling resilience delivery for a mission-critical telecoms environment.

UPS Installation – Public Transport Infrastructure

Resilience upgrade of standby power systems for a major UK transport facility.

TVP Case Study - Awaiting approval

Let’s build measurable results into your estate

Speak to EMC about technology-led solutions that reduce energy consumption, improve building ratings, and protect critical systems.